Land Finance with Planning Permission

How can a property be financed after a building permit has been granted? This guide shows which project, cost, equity and collateral documents lenders typically check and how the financing is structured until disbursement.

Status: 29. August 2026 · Technically tested by Jürgen Kronawitter

Land financing with building permit for an approved residential construction project
Direct answer

When is a real estate finance for property developers possible?

At a glance: For a resilient property financing, building permit, property right, cost and scheduling, equity, collateral and repayment must fit together. In this area, Alternate Immobilien only arranges financing for projects for which the building permit is already available.

Approval alone does not lead to a loan commitment. In addition, lenders checks whether the approved project complies with calculations, construction contracts, market assumptions and financing structure. Deviations between approved planning and financial model must be openly explained and financially mapped.

Approval status

What “With Building Permit” Means for Funding Review

What matters is not only the document itself. lenders compare the scope of approval, approved plans, project calculation and planned construction process.

Test fieldWhat should be comprehensibleTypical open question
Scope of approvalUse, structure, areas, pitches and approved building designsDoes the model finance the approved project?
Ancillary provisionsConditions, conditions and technical evidence to be providedAre there additional costs or delays?
Legal and time-limit statusService, legal remedies, period of validity and required notices of start of constructionCan we start on a scheduled and legally compliant basis?
Project identityConsistency between planning permission, land ownership, the SPV, the cost plan and sales documentsAre there any unapproved plan changes?

The building code details differ by location. For example, rules governing Art. 68 BayBO Issuance, written form, approval fiction and prerequisites for the start of construction in Bavaria. For projects in other federal states as well as in Austria or Switzerland, the applicable law is relevant.

Important: The building permit is granted without prejudice to the private rights of third parties. Ownership, easements, construction loads, rankings and other land risks therefore remain independent examination points.

Credit assessment

Eight prerequisites for an auditable property financing

A lender not only finances a property, but a complete return logic. These eight building blocks should be consistently documented.

01 · Property

Secured Acquisition and Clear land register

Notarial purchase contract or proof of ownership, up-to-date land register extract, cadastral map, purchase price due, prior notice, easements, construction loads and, where applicable, contaminated loads must be classified. Contracts for the sale of land shall be subject to: § 311b BGB Notarization of Notarization.

02 · Approval

Approved and affordable concept

Building permits, approved plans, building description, area calculation and ancillary provisions belong together. Cost and revenue planning must be based on precisely this level of planning.

03 · Sponsor

Experience and economic sustainability

Lenders check track record, ongoing projects, financial statements, current economic documents, origin of own funds and possible liability. In a young project company, the performance of the sponsors is particularly in focus.

04 · Calculation

Full use of funds with reserve

Land, acquisition costs, construction and ancillary development costs, taxes, sales expenses, financing costs, contingency and liquidity must be included in the sources and uses statement and the drawdown timetable.

05 · Construction

Assignment, dates and cost-to-complete

JV/VDC contract or robust trade offers, schedule, supplementary mechanics and technical project management show whether approved concept and budget can be implemented.

06 · equityZ

Detectable, Available and Properly Terminated

Amount, origin, time of deposit and previous project expenses are taken up. Whether shareholder loans or subordinated funds are recognised determines the specific financing structure.

07 · Market

Reliable sales prices or income

The market study, unit and price schedule, sales strategy, presales or, for investment properties, the proposed letting and stabilisation plan must be consistent with the location and timetable.

08 · Repayment

Exit with realistic buffer

Sale, forward sale, long-term investment property finance or another exit are presented in a comprehensible manner with amount and date. Sensitivities show what happens with delay, additional costs or lower revenues.

Approval, land and calculation documents for land financing
Approval, property rights, cost planning and financing must reflect the same project status.

An ordered document structure can be found in the Checklist for documents for real estate project financing§ 18 KWG and the EBA guidelines on lending and monitoring form a regulatory framework; the specific requirements list remains lenders- and project-specific.

Capital structure

Which financing structure fits the approved property?

The correct structure depends, among other things, on loan, equity, schedule, construction cost risk and exit. A product name therefore does not replace a project review.

Priority

Senior loans

First-line financing through bank or institutional lenders. Typical are detailed credit checks, collateral orders and clearly defined conditions for first and further payouts.

Total tranche

Whole loans

An integrated debt tranche can simplify coordination, but is priced differently by risk and loan than a classical banking structure.

Complement

Senior plus mezzanine

subordinated capital can complement an equity gap. Rank, term, remuneration and intercreditor rules must fit the priority financing.

Time-critical

Bridge loan

In the case of a narrow execution window, a short-running structure may be useful. The prerequisite remains a reliable repayment by mortgage financing, sale or refinancing.

Exemplary use of fundsAmountPossible source
Land and non-profit-making costs€3.4 millionequity and/or debt capital
Construction and construction costs including reserve€6.6 millionSenior, Whole Loan or combined structure
Total€10.0 millionProject-specific funding mix

The example only shows the logic of Sources & Uses. It does not contain a statement on financeable quotas, conditions or a loan commitment.

From project to payment

Expiry of a land financing with building permit

01

Reconciliation of basic parameters and approval

Project, land, building permit, capital requirements, own funds, schedule and exit are checked for basic fit.

02

Defining the financing structure

Senior, Whole Loan, Mezzanine or Combination are classified according to risk, rank, maturity and repayment.

03

Prepare data room for credit committee

Legal, sponsorship, approval, cost, market, construction and collateral documents shall be structured consistently.

04

Applying Suitable lenders

The request is addressed specifically to addresses whose volume, asset class, region and risk profile fit the project.

05

Audit, evaluation and contracts

Lenders check credit rating and project, if necessary, have technical and economic evaluations carried out and formulate credit and collateral contracts.

06

Fulfilment of payment requirements

Only when the contractually agreed conditions are proven and released, the payment can take place. More about this in the guide Payment requirements at property development finance.

Avoiding delays

Five Common Mistakes in Land Financing

Approval

Plans and calculations do not fit together

The Financial Model charges for additional space, pitches or other use not covered by this permit.

Costs

Absence of occupational costs and reserve

Real estate transfer tax, notary, planning, financing costs or cost buffer are incomplete and later generate an unfunded gap.

timing

Purchase price due before closing

Notarial deadlines, conditions of the seller and realistic credit process were not coordinated.

Equity

Funds are announced but not proven

Origin, availability, rank and time of deposit remain open or existing project expenses are not cleanly documented.

Exit

Repayment based only on the best case

Sales time, revenues or follow-on finance do not contain a buffer for market, cost and forward deviations.

Frequently asked questions

Land financing with building permit – briefly answered

Does Alternate finance land without a building permit?

No. In this area, Alternate Immobilien only arranges financing for projects for which the building permit is already available. Building advance decision, ongoing approval process or expected building rights are not sufficient for this service.

Does the building permit alone suffice for a financing commitment?

No. lenders additionally examine property rights, borrowers and sponsors, costs, dates, construction contracts, equity, collateral, market assumptions and repayment. A commitment arises only after a complete credit decision.

Does the building permit have to be valid?

This depends on the project, location and lenders. Redress status, neighbourhood consents, ancillary provisions and time limits should be transparently documented. The quality of the approval for decision or disbursement is required in the specific financing agreement.

Which documents are particularly important for the first examination?

Typical are building permit and approved plans, land and purchase documents, project profile, cost and time planning, capital requirements and own funds, sponsor track record, construction contracts as well as sale, rental or other exit.

Can the land purchase and construction be jointly financed?

Yes, if lenders and structure so provide. For example, continuous project financing or separate tranches for acquisition and construction are possible. Payment, use of equity and collateral must be synchronised in time.

What role does mezzanine capital play?

Mezzanine can complement a gap between senior loan and real equity. It does not replace approval or project review and must be coordinated with priority lenders in terms of ranking, duration and return.

Does a full request guarantee funding?

No. Complete documents allow a robust examination, but do not replace a credit decision. Financial viability and conditions always depend on the specific project and the risk profile of the lenders.

Next step

Is there a building permit? Get the project structure in order

Submit location, permit status, capital requirements, own funds and schedule. Alternate Capital sets the starting position and discusses possible next steps.

Alternate Immobilien GmbH – Jürgen Kronawitter
About the author

Jürgen Kronawitter

Jürgen Kronawitter is Managing Director of Alternate Immobilien GmbH. He accompanies property developers, property developers, investors and property investors in structuring and arranging professional real estate finance in the Germany, Austria and Switzerland.

Jürgen Kronawitter on LinkedIn →More about the author